diff --git a/AUDIT_REPORT.md b/AUDIT_REPORT.md index 627a5b0..3215925 100644 --- a/AUDIT_REPORT.md +++ b/AUDIT_REPORT.md @@ -1,6 +1,6 @@ # YGIT Current Engineering Audit Report -Version: 1.8 +Version: 1.9 Status: Verified Foundation / Pre-Live Integration Updated: 2026-07-24 @@ -24,7 +24,7 @@ This report covers the current YGIT MVP source through: - AG-001 Deploy Provider Gate standalone foundation. - AG-002 Repository Provider Gate standalone foundation with GitHub default and no runtime wiring. - Immutable running baseline lock at `b9019b79d1af3fe73d1a74769792ebb6958c4f4c`. -- Backend CI documentation contract, implementation workflow, read-only security boundary, and successful Draft PR validation. +- Backend CI documentation contract, implementation workflow, read-only security boundary, successful pull-request validation, controlled merge, and successful merged-main push validation. - Connected Accounts metadata and repository-reuse UI. ## Verified Results @@ -75,7 +75,7 @@ This report covers the current YGIT MVP source through: | Backend CI permissions | CONTENTS READ ONLY | | Backend CI provider execution | DISABLED | | Backend CI production secrets | NOT USED | -| Backend CI post-merge push verification | PENDING | +| Backend CI post-merge push verification | PASS — run `30106115262` / job `89523839117` on `6e44866de9ec3a3a745777afc12276f903259709` | | Backend CI branch protection | NOT ENABLED / NOT AUTHORIZED | | Runtime readiness artifacts in image | PACKAGED, REDEPLOY PENDING | | Coolify redeploy | NOT EXECUTED | @@ -103,7 +103,7 @@ One non-blocking `StarletteDeprecationWarning` remains in the existing test-clie - Deterministic intent keys prevent duplicate log writes during sequential retries. - Completed history records short-circuit duplicate deploy/redeploy execution. - Backend CI runs with `contents: read`, checkout credentials are not persisted, provider execution remains disabled, and no production secret or deployment action is present. -- Pull-request run `30061513976` completed successfully at workflow commit `7f383ba6b0c17b92de9a27e0abe4cbeb8adbbac2`; post-merge push validation remains pending. +- Final-head pull-request run `30096212556` / job `89490793519` and merged-main push run `30106115262` / job `89523839117` completed successfully; Phase 0 merged at `6e44866de9ec3a3a745777afc12276f903259709`. ## Documentation Findings @@ -118,7 +118,7 @@ Before this update: This update separates the historical release baseline from the current engineering snapshot. -This closure update also records the implemented Backend CI workflow and its successful Draft PR validation. It does not claim post-merge validation, branch-protection enforcement, Phase 0 completion, or production readiness. +The Phase 0 completion record confirms controlled merge through PR #1 and successful push-triggered Backend CI on the resulting `main` commit. It does not claim branch-protection enforcement, deployment completion, live provider execution, or production readiness. ## Not Executed @@ -131,7 +131,6 @@ Live Cloudflare Pages project/deployment execution Production HTTPS authenticated user flow Production admin operations flow Deployment history persistence from a real provider result -Backend CI push-triggered validation on merged main Branch-protection enforcement using Backend CI / Validate ``` @@ -152,7 +151,6 @@ Primary remaining risks are integration risks rather than missing core provider - Partial asset-upload recovery. - External account and permission misconfiguration. - Production observability. -- Successful `push`-triggered Backend CI verification after an approved merge. - Separately approved branch-protection enforcement using the stable CI check. ## Verification Commands diff --git a/CHANGELOG.md b/CHANGELOG.md index 15e917e..149e94f 100644 --- a/CHANGELOG.md +++ b/CHANGELOG.md @@ -2,6 +2,24 @@ All notable YGIT MVP implementation releases and active engineering foundations are tracked here. +## Unreleased — Phase 0 Completion Record — 2026-07-24 + +### Completed + +- Merged PR #1 through merge commit `6e44866de9ec3a3a745777afc12276f903259709`. +- Preserved the approved feature head `06071e5f41c5b727edc620469a1c0504b7a1676b` and feature branch. +- Verified final-head pull-request CI run `30096212556` / job `89490793519`. +- Verified merged-main push CI run `30106115262` / job `89523839117`. +- Added `docs/phase0/PHASE0_COMPLETION_RECORD.md`. + +### Boundaries + +- No provider execution, production secret, database migration, deployment, or Coolify action was performed. +- Branch protection remains disabled and requires separate approval. +- AG-001 and AG-002 remain not runtime-wired. +- The next controlled path begins with redeployment of the verified current `main` and live UI/runtime validation. + + ## Unreleased — Phase 0 Backend CI Documentation and Status Closure — 2026-07-24 ### Added diff --git a/CONTRACT_MANIFEST.json b/CONTRACT_MANIFEST.json index c91bc2d..4b62fcf 100644 --- a/CONTRACT_MANIFEST.json +++ b/CONTRACT_MANIFEST.json @@ -138,7 +138,9 @@ "mvp_completion_estimate": "approximately_97_percent", "latest_full_suite": "579_passed_1_warning", "release_gate_skip_db": "pass", - "backend_ci_status": "implemented_pr_verified_post_merge_pending" + "backend_ci_status": "implemented_pr_and_main_verified", + "phase0_status": "complete", + "phase0_merge_commit": "6e44866de9ec3a3a745777afc12276f903259709" }, "engine_contract": "1.0", "engine_contract_version": "1.0", @@ -255,7 +257,8 @@ "backend_ci_workflow": ".github/workflows/backend-ci.yml", "backend_ci_specification": "docs/ci/BACKEND_CI_SPECIFICATION.md", "backend_ci_implementation_plan": "docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md", - "backend_ci_testing_and_rollback": "docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md" + "backend_ci_testing_and_rollback": "docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md", + "phase0_completion_record": "docs/phase0/PHASE0_COMPLETION_RECORD.md" }, "release_gate": { "new_migration": null, @@ -416,7 +419,7 @@ }, "backend_ci": { "contract_version": "0.1.0", - "status": "implemented_pr_verified_post_merge_pending", + "status": "implemented_pr_and_main_verified", "workflow_path": ".github/workflows/backend-ci.yml", "workflow_name": "Backend CI", "job_id": "validate", @@ -443,12 +446,51 @@ "conclusion": "success" }, "post_merge_push_validation": { - "verified": false, - "status": "pending_approved_merge" + "verified": true, + "status": "success", + "run_id": 30106115262, + "job_id": 89523839117, + "head_branch": "main", + "head_sha": "6e44866de9ec3a3a745777afc12276f903259709", + "event": "push", + "conclusion": "success" }, "branch_protection": { "enabled": false, "authorized": false + }, + "final_head_pull_request_validation": { + "verified": true, + "run_id": 30096212556, + "job_id": 89490793519, + "head_sha": "06071e5f41c5b727edc620469a1c0504b7a1676b", + "conclusion": "success" + }, + "merge": { + "verified": true, + "pull_request": 1, + "merge_method": "merge", + "merge_commit": "6e44866de9ec3a3a745777afc12276f903259709", + "parents": [ + "b9019b79d1af3fe73d1a74769792ebb6958c4f4c", + "06071e5f41c5b727edc620469a1c0504b7a1676b" + ], + "merged_at": "2026-07-24T15:37:52Z", + "feature_branch_deleted": false } + }, + "phase0_completion": { + "status": "complete", + "completion_record": "docs/phase0/PHASE0_COMPLETION_RECORD.md", + "pull_request": 1, + "feature_head": "06071e5f41c5b727edc620469a1c0504b7a1676b", + "locked_base": "b9019b79d1af3fe73d1a74769792ebb6958c4f4c", + "merge_commit": "6e44866de9ec3a3a745777afc12276f903259709", + "merged_at": "2026-07-24T15:37:52Z", + "post_merge_push_run_id": 30106115262, + "post_merge_push_job_id": 89523839117, + "deployment_performed": false, + "coolify_redeploy_performed": false, + "branch_protection_enabled": false } } diff --git a/PROJECT_STATUS.md b/PROJECT_STATUS.md index 57e0ae9..a633f5c 100644 --- a/PROJECT_STATUS.md +++ b/PROJECT_STATUS.md @@ -65,7 +65,7 @@ Business logic remains outside the Dashboard. Providers are not imported directl | Admin Panel | Implemented | Production operations validation | | GitHub Provider | Foundation implemented | Controlled live API execution | | Cloudflare Provider | OAuth/account and Pages deployment primitives implemented | Controlled live API execution and operational hardening | -| Backend CI | Implemented; Draft PR pull-request validation succeeded with stable status `Backend CI / Validate` | Documentation/PR metadata closure, approved merge, post-merge push validation, and separately approved branch protection | +| Backend CI | Implemented; pull-request and merged-main push validation succeeded with stable status `Backend CI / Validate` | Separately approved branch protection; PR #1 merged at `6e44866de9ec3a3a745777afc12276f903259709` | ## Recently Completed Foundations @@ -88,7 +88,8 @@ Business logic remains outside the Dashboard. Providers are not imported directl - AG-001 Deploy Provider Gate foundation with Cloudflare default and fail-closed future resolver contract. - AG-002 Repository Provider Gate standalone foundation with GitHub default and unchanged current repository logic. - Running baseline locked at `b9019b79d1af3fe73d1a74769792ebb6958c4f4c` with immutable tag, baseline branch, source ZIP, Git bundle, and SHA-256 evidence. -- Backend CI workflow implemented at `.github/workflows/backend-ci.yml`; pull-request run `30061513976` and `Validate` job `89383928195` completed successfully with read-only contents permission and provider execution disabled. +- Backend CI workflow implemented at `.github/workflows/backend-ci.yml`; final-head pull-request run `30096212556` / job `89490793519` and merged-main push run `30106115262` / job `89523839117` completed successfully with read-only contents permission and provider execution disabled. +- Phase 0 merged through PR #1 at `6e44866de9ec3a3a745777afc12276f903259709`; the feature branch remains preserved and no deployment or branch-protection change was performed. ## Current Safety Boundary @@ -126,9 +127,13 @@ Smoke --skip-db: PASS Release gate --skip-db: PASS Backend CI workflow: IMPLEMENTED Backend CI / Validate: SUCCESS -Backend CI pull-request run: 30061513976 -Backend CI job: 89383928195 -Backend CI post-merge push verification: PENDING +Backend CI final-head pull-request run: 30096212556 +Backend CI final-head pull-request job: 89490793519 +Backend CI post-merge push run: 30106115262 +Backend CI post-merge push job: 89523839117 +Backend CI post-merge push verification: SUCCESS +Phase 0 merge commit: 6e44866de9ec3a3a745777afc12276f903259709 +Phase 0 completion: COMPLETE Branch protection required-check enablement: NOT AUTHORIZED ``` @@ -136,17 +141,13 @@ Database checks were skipped. External providers were not executed. ## Remaining Critical Path -1. Close Backend CI documentation/status evidence and verify the new Draft PR workflow result. -2. Reconcile PR metadata and complete the final read-only audit. -3. Obtain explicit Ready-for-review and merge approvals; no automatic transition or merge is allowed. -4. After controlled merge, verify the `push`-triggered `Backend CI / Validate` result on `main` and record Phase 0 completion. -5. Redeploy the current `main` branch and validate the Dashboard compact provider cards, Project Open flow, and backend-readiness-gated Deploy flow. -6. Reduce the GitHub App to the approved minimum permissions, reconnect the controlled installation, and verify captured permission scopes. -7. Implement GitHub App installation-token repository acquisition with a pinned commit SHA and normalized real file-tree snapshot. -8. Implement the approved deep-analysis execution and Project reattachment boundaries. -9. Confirm `deploy_ready=true` from real repository evidence and execute one controlled Cloudflare Pages deployment. -10. Resolve only defects demonstrated by live evidence. -11. Keep AG-001 and AG-002 runtime integration deferred until separate post-MVP architecture approval. +1. Redeploy the verified current `main` branch and validate the Dashboard compact provider cards, Project Open flow, and backend-readiness-gated Deploy flow. +2. Reduce the GitHub App to the approved minimum permissions, reconnect the controlled installation, and verify captured permission scopes. +3. Implement GitHub App installation-token repository acquisition with a pinned commit SHA and normalized real file-tree snapshot. +4. Implement the approved deep-analysis execution and Project reattachment boundaries. +5. Confirm `deploy_ready=true` from real repository evidence and execute one controlled Cloudflare Pages deployment. +6. Resolve only defects demonstrated by live evidence. +7. Keep AG-001 and AG-002 runtime integration deferred until separate post-MVP architecture approval. ## Documentation Authority @@ -159,6 +160,7 @@ Current-state documents: - `CHANGELOG.md` - `AUDIT_REPORT.md` - `REPOSITORY_ANALYSIS_CURRENT_STATE_AUDIT.md` +- `docs/phase0/PHASE0_COMPLETION_RECORD.md` - `docs/ci/BACKEND_CI_SPECIFICATION.md` - `docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md` - `docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md` @@ -170,6 +172,7 @@ Historical release artifacts retain their original versioned purpose. Where a hi | Date | Revision | Summary | |---|---|---| +| 2026-07-24 | 2.2 | Recorded PR #1 controlled merge, merge commit `6e44866de9ec3a3a745777afc12276f903259709`, successful merged-main Backend CI, and Phase 0 completion | | 2026-07-24 | 2.1 | Recorded Backend CI implementation, successful Draft PR validation, security boundaries, and remaining post-merge Phase 0 gates | | 2026-07-23 | 2.0 | Locked the running baseline, reconciled current status/configuration evidence, and added the standalone AG-002 Repository Provider Gate foundation without runtime wiring | | 2026-07-22 | 1.9 | Documented the current Repository Analysis input, readiness, deep-queue, recalculation, and Project attachment gaps | diff --git a/README.md b/README.md index 124bccd..028ed99 100644 --- a/README.md +++ b/README.md @@ -186,9 +186,10 @@ Full suite: 579 passed, 1 warning Smoke test with database skipped: PASS Release gate with database skipped: PASS Backend CI workflow: IMPLEMENTED at .github/workflows/backend-ci.yml -Backend CI / Validate (pull-request run 30061513976): SUCCESS -Backend CI job 89383928195: completed / success -Backend CI post-merge push verification: PENDING +Backend CI final-head pull-request validation: SUCCESS — run 30096212556 / job 89490793519 +Backend CI post-merge main validation: SUCCESS — run 30106115262 / job 89523839117 +Phase 0 merge commit: 6e44866de9ec3a3a745777afc12276f903259709 +Phase 0 completion record: COMPLETE Branch-protection required-check enablement: NOT AUTHORIZED Live PostgreSQL: NOT EXECUTED Live Redis worker loop: NOT EXECUTED @@ -201,7 +202,7 @@ The recurring `StarletteDeprecationWarning` is non-blocking and relates to the e ## Backend CI State -The initial Backend CI workflow is implemented on Draft PR #1. +Backend CI is implemented, PR-verified, merged through PR #1, and push-verified on the resulting `main` merge commit. ```text Workflow file: .github/workflows/backend-ci.yml @@ -210,14 +211,17 @@ Job: Validate Stable status: Backend CI / Validate Pull-request validation: SUCCESS Workflow commit: 7f383ba6b0c17b92de9a27e0abe4cbeb8adbbac2 -Run ID: 30061513976 -Job ID: 89383928195 +Final-head PR run ID: 30096212556 +Final-head PR job ID: 89490793519 +Merge commit: 6e44866de9ec3a3a745777afc12276f903259709 +Post-merge push run ID: 30106115262 +Post-merge push job ID: 89523839117 Permissions: contents read Python: 3.12 MyPy required gate: DEFERRED Provider execution: DISABLED Production secrets: NOT USED -Post-merge push validation: PENDING +Post-merge push validation: SUCCESS Branch protection: NOT ENABLED ``` @@ -235,16 +239,13 @@ Live checks must use the controlled runtime runbook and dedicated test accounts. ## Immediate Critical Path -1. Complete Backend CI documentation/status closure and verify `Backend CI / Validate` on the resulting Draft PR commit. -2. Reconcile PR #1 title/body, rerun the final read-only audit, and obtain explicit Ready-for-review and merge approvals. -3. After an approved merge, verify the `push`-triggered `Backend CI / Validate` result on `main` and record Phase 0 completion. -4. Redeploy the current `main` branch and validate the Dashboard compact provider cards, Project Open flow, and backend-readiness-gated Deploy flow. -5. Reduce the GitHub App to the approved minimum permissions, reconnect the controlled installation, and verify captured permission scopes. -6. Implement GitHub App installation-token repository acquisition with a pinned commit SHA and normalized real file-tree snapshot. -7. Implement the approved deep-analysis execution and Project reattachment boundaries. -8. Confirm `deploy_ready=true` from real repository evidence and execute one controlled Cloudflare Pages deployment. -9. Resolve only defects demonstrated by live evidence. -10. Keep AG-001 and AG-002 runtime integration deferred until separate post-MVP architecture approval. +1. Redeploy the verified current `main` branch and validate the Dashboard compact provider cards, Project Open flow, and backend-readiness-gated Deploy flow. +2. Reduce the GitHub App to the approved minimum permissions, reconnect the controlled installation, and verify captured permission scopes. +3. Implement GitHub App installation-token repository acquisition with a pinned commit SHA and normalized real file-tree snapshot. +4. Implement the approved deep-analysis execution and Project reattachment boundaries. +5. Confirm `deploy_ready=true` from real repository evidence and execute one controlled Cloudflare Pages deployment. +6. Resolve only defects demonstrated by live evidence. +7. Keep AG-001 and AG-002 runtime integration deferred until separate post-MVP architecture approval. ## Documentation Scope @@ -258,6 +259,7 @@ The following files are current project references: - `AUDIT_REPORT.md` - `REPOSITORY_ANALYSIS_CURRENT_STATE_AUDIT.md` - `docs/architecture/AG_002_REPOSITORY_PROVIDER_GATE.md` +- `docs/phase0/PHASE0_COMPLETION_RECORD.md` - `docs/ci/BACKEND_CI_SPECIFICATION.md` - `docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md` - `docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md` diff --git a/VERSION.json b/VERSION.json index 5c32467..fe98a53 100644 --- a/VERSION.json +++ b/VERSION.json @@ -84,7 +84,7 @@ "full_test_suite": "570_passed_1_warning" }, "backend_ci": { - "status": "implemented_pr_verified_post_merge_pending", + "status": "implemented_pr_and_main_verified", "workflow_path": ".github/workflows/backend-ci.yml", "workflow_name": "Backend CI", "job_id": "validate", @@ -95,11 +95,33 @@ "pull_request_run_id": 30061513976, "pull_request_job_id": 89383928195, "pull_request_run_verified": true, - "post_merge_push_verified": false, + "post_merge_push_verified": true, "branch_protection_enabled": false, "provider_execution": false, "production_secrets_required": false, - "deployment_execution": false + "deployment_execution": false, + "final_head_pull_request_run_id": 30096212556, + "final_head_pull_request_job_id": 89490793519, + "merge_commit": "6e44866de9ec3a3a745777afc12276f903259709", + "merged_at": "2026-07-24T15:37:52Z", + "post_merge_push_run_id": 30106115262, + "post_merge_push_job_id": 89523839117, + "post_merge_push_conclusion": "success" + }, + "phase0": { + "status": "complete", + "pull_request": 1, + "feature_branch": "phase0/baseline-reconciliation-ag002", + "feature_head": "06071e5f41c5b727edc620469a1c0504b7a1676b", + "locked_base": "b9019b79d1af3fe73d1a74769792ebb6958c4f4c", + "merge_commit": "6e44866de9ec3a3a745777afc12276f903259709", + "merged_at": "2026-07-24T15:37:52Z", + "post_merge_push_run_id": 30106115262, + "post_merge_push_job_id": 89523839117, + "completion_record": "docs/phase0/PHASE0_COMPLETION_RECORD.md", + "deployment_performed": false, + "coolify_redeploy_performed": false, + "branch_protection_enabled": false } }, "domain": { @@ -222,7 +244,7 @@ }, "backend_ci": { "version": "0.1.0", - "status": "implemented_pr_verified_post_merge_pending", + "status": "implemented_pr_and_main_verified", "workflow": ".github/workflows/backend-ci.yml", "workflow_name": "Backend CI", "job_name": "Validate", @@ -235,11 +257,17 @@ "pull_request_run_id": 30061513976, "pull_request_job_id": 89383928195, "pull_request_conclusion": "success", - "post_merge_push_verified": false, + "post_merge_push_verified": true, "branch_protection_enabled": false, "provider_execution": false, "deployment_execution": false, - "coolify_redeploy_required": false + "coolify_redeploy_required": false, + "final_head_pull_request_run_id": 30096212556, + "final_head_pull_request_job_id": 89490793519, + "merge_commit": "6e44866de9ec3a3a745777afc12276f903259709", + "post_merge_push_run_id": 30106115262, + "post_merge_push_job_id": 89523839117, + "post_merge_push_conclusion": "success" } }, "release": "0.1.0-live-runtime-smoke-test-plan", diff --git a/docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md b/docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md index ccb2458..fe348b3 100644 --- a/docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md +++ b/docs/ci/BACKEND_CI_IMPLEMENTATION_PLAN.md @@ -1,7 +1,7 @@ # YGIT Backend CI Implementation Plan -**Version:** 0.1.5 -**Status:** Implemented / Verified +**Version:** 0.1.6 +**Status:** Implemented / PR and Main Verified **Product:** YGIT **Company:** Vib Tools **Document Type:** Engineering Implementation Plan @@ -19,20 +19,23 @@ This document defines the controlled implementation plan for the first YGIT Back The plan translates the approved Backend CI specification into an exact, reviewable, rollbackable implementation sequence. -The controlled implementation defined by this plan has been completed and verified on Draft PR #1. +The controlled implementation defined by this plan was verified on PR #1, merged through `6e44866de9ec3a3a745777afc12276f903259709`, and push-verified on the resulting `main` commit. Implementation evidence: ```text Workflow file: .github/workflows/backend-ci.yml Workflow commit: 7f383ba6b0c17b92de9a27e0abe4cbeb8adbbac2 -Workflow run: 30061513976 -Validate job: 89383928195 +Final-head PR run: 30096212556 +Final-head Validate job: 89490793519 +Merge commit: 6e44866de9ec3a3a745777afc12276f903259709 +Post-merge push run: 30106115262 +Post-merge Validate job: 89523839117 Required status: Backend CI / Validate Conclusion: success ``` -This completion record does not authorize Ready transition, merge, branch protection, deployment, or the next MVP implementation area. +This record confirms CI implementation and Phase 0 merge closure. It does not authorize branch-protection enforcement or deployment. --- @@ -1249,7 +1252,7 @@ Pull-request evidence: run 30061513976 / job 89383928195 / success Post-merge evidence: -PENDING +SUCCESS — run 30106115262 / job 89523839117 on 6e44866de9ec3a3a745777afc12276f903259709 Runner: ubuntu-latest @@ -1284,7 +1287,7 @@ Provider execution: disabled Target: -existing Draft PR #1 +PR #1 CLOSED / MERGED; main verified Direct push to main: forbidden diff --git a/docs/ci/BACKEND_CI_SPECIFICATION.md b/docs/ci/BACKEND_CI_SPECIFICATION.md index 8481838..45beaa1 100644 --- a/docs/ci/BACKEND_CI_SPECIFICATION.md +++ b/docs/ci/BACKEND_CI_SPECIFICATION.md @@ -1,7 +1,7 @@ # YGIT Backend CI Specification -**Version:** 0.1.4 -**Status:** Approved / Implemented +**Version:** 0.1.5 +**Status:** Approved / Implemented / Main Verified **Product:** YGIT **Company:** Vib Tools **Document Type:** Engineering Specification @@ -49,9 +49,9 @@ Architecture boundaries: PASS Basic secret scan: PASS ``` -Draft Pull Request #1 contains the Phase 0 baseline reconciliation, AG-002 Repository Provider Gate foundation, Backend CI documentation, and the implemented Backend CI workflow. +Pull Request #1 contained the Phase 0 baseline reconciliation, AG-002 Repository Provider Gate foundation, Backend CI documentation, and the implemented Backend CI workflow. It is now merged through `6e44866de9ec3a3a745777afc12276f903259709`. -The workflow is implemented at `.github/workflows/backend-ci.yml`. Pull-request run `30061513976` completed successfully for workflow commit `7f383ba6b0c17b92de9a27e0abe4cbeb8adbbac2`; `Validate` job `89383928195` completed with conclusion `success`. +The workflow is implemented at `.github/workflows/backend-ci.yml`. Final-head pull-request run `30096212556` / job `89490793519` and merged-main push run `30106115262` / job `89523839117` completed with conclusion `success`. This specification is the approved and implemented CI contract. Post-merge push validation and any branch-protection enforcement remain separate pending gates. @@ -994,7 +994,7 @@ Post-merge `push` validation and branch-protection enforcement remain separate c ```text Implementation status: -APPROVED / IMPLEMENTED / PR VERIFIED +APPROVED / IMPLEMENTED / PR AND MAIN VERIFIED Workflow: Backend CI @@ -1003,10 +1003,10 @@ Required status: Backend CI / Validate Pull-request validation: -SUCCESS — run 30061513976 / job 89383928195 +SUCCESS — run 30096212556 / job 89490793519 Post-merge push validation: -PENDING +SUCCESS — run 30106115262 / job 89523839117 on 6e44866de9ec3a3a745777afc12276f903259709 Triggers: pull_request → main @@ -1035,7 +1035,7 @@ Deployment: Not allowed Current PR: -Remain draft +#1 CLOSED / MERGED Automatic merge: Forbidden diff --git a/docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md b/docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md index c33c5c1..0eff9b3 100644 --- a/docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md +++ b/docs/ci/BACKEND_CI_TESTING_AND_ROLLBACK_SPECIFICATION.md @@ -1,7 +1,7 @@ # YGIT Backend CI Testing and Rollback Specification -**Version:** 0.1.5 -**Status:** PR Validation Complete / Post-Merge Pending +**Version:** 0.1.6 +**Status:** PR and Main Validation Complete **Product:** YGIT **Company:** Vib Tools **Document Type:** Engineering Testing and Rollback Specification @@ -1420,6 +1420,7 @@ This document still does not authorize: | 2026-07-23 | 0.1.2 | Draft for Approval | Replaced the invalid full-backend MyPy success requirement with a deferral audit based on the locked-head 744-error diagnostic and a separate future enablement gate | | 2026-07-23 | 0.1.3 | Draft for Approval | Corrected the pre-workflow head and added a resolver simulation matrix covering root-level scripts, NUL-delimited paths, rename/deletion behavior, spaces, and zero-`before` fallback | | 2026-07-23 | 0.1.4 | Draft for Approval | Replaced the recursively stale hard-coded pre-workflow SHA with a patch-manifest authority and added head-alignment and stale-document rejection tests | +| 2026-07-24 | 0.1.6 | PR and Main Validation Complete | Recorded controlled merge `6e44866de9ec3a3a745777afc12276f903259709` and successful push-triggered validation run `30106115262` / job `89523839117`; branch protection remains separately pending | | 2026-07-24 | 0.1.5 | PR Validation Complete / Post-Merge Pending | Recorded successful local and pull-request validation evidence while retaining post-merge push CI and branch-protection readiness as pending | --- @@ -1442,10 +1443,10 @@ smoke --skip-db release gate --skip-db Remote test: -pull_request workflow on PR #1 — SUCCESS (run 30061513976 / job 89383928195) +pull_request workflow on PR #1 — SUCCESS (run 30096212556 / job 89490793519) Post-merge test: -push workflow on main — PENDING +push workflow on main — SUCCESS (run 30106115262 / job 89523839117 on 6e44866de9ec3a3a745777afc12276f903259709) Production secrets: forbidden @@ -1465,8 +1466,8 @@ revert commit Force push: forbidden without separate approval -PR state during validation: -OPEN and DRAFT +PR final state: +CLOSED and MERGED Automatic merge: forbidden diff --git a/docs/phase0/PHASE0_COMPLETION_RECORD.md b/docs/phase0/PHASE0_COMPLETION_RECORD.md new file mode 100644 index 0000000..502640a --- /dev/null +++ b/docs/phase0/PHASE0_COMPLETION_RECORD.md @@ -0,0 +1,263 @@ +# YGIT Phase 0 Completion Record + +**Version:** 1.0.0 +**Status:** Complete / Merged-Main Verified +**Product:** YGIT +**Company:** Vib Tools +**Date:** 2026-07-24 + +--- + +## 1. Purpose + +This document records the controlled completion of YGIT Phase 0. + +Phase 0 established the immutable pre-completion baseline, reconciled the +authoritative engineering state, added the standalone AG-002 Repository +Provider Gate foundation, implemented Backend CI, completed pull-request +validation, merged the approved change through a merge commit, and verified the +push-triggered Backend CI result on `main`. + +This record does not claim production readiness, live provider execution, +branch-protection enforcement, or deployment completion. + +--- + +## 2. Repository Evidence + +```text +Repository: +vibtools/ygit + +Pull request: +#1 + +Pull-request state: +CLOSED / MERGED + +Feature branch: +phase0/baseline-reconciliation-ag002 + +Approved feature head: +06071e5f41c5b727edc620469a1c0504b7a1676b + +Locked pre-merge main: +b9019b79d1af3fe73d1a74769792ebb6958c4f4c + +Merge commit: +6e44866de9ec3a3a745777afc12276f903259709 + +Merged at: +2026-07-24T15:37:52Z + +Merge method: +merge commit + +Merge-commit parents: +1. b9019b79d1af3fe73d1a74769792ebb6958c4f4c +2. 06071e5f41c5b727edc620469a1c0504b7a1676b + +Feature branch deleted: +NO +``` + +--- + +## 3. Pull-Request CI Evidence + +```text +Workflow: +Backend CI + +Required status: +Backend CI / Validate + +Final-head pull-request run: +30096212556 + +Validate job: +89490793519 + +Head: +06071e5f41c5b727edc620469a1c0504b7a1676b + +Event: +pull_request + +Conclusion: +success +``` + +--- + +## 4. Post-Merge Main CI Evidence + +```text +Workflow: +Backend CI + +Push run: +30106115262 + +Validate job: +89523839117 + +Head branch: +main + +Head SHA: +6e44866de9ec3a3a745777afc12276f903259709 + +Event: +push + +Conclusion: +success +``` + +Every Validate step completed successfully: + +```text +Checkout +Python 3.12 setup +Dependency installation +Python compilation +MyPy deferral verification +Baseline-aware changed-file Ruff +Full pytest suite +Smoke --skip-db +Release gate --skip-db +``` + +--- + +## 5. Completed Phase 0 Gates + +```text +Immutable baseline lock: +COMPLETE + +Baseline reconciliation: +COMPLETE + +AG-002 standalone foundation: +COMPLETE + +Backend CI specification and implementation: +COMPLETE + +Pull-request CI validation: +COMPLETE + +PR metadata reconciliation: +COMPLETE + +Final forensic audit: +COMPLETE / PASS + +Ready authorization and transition: +COMPLETE + +Final pre-merge gate: +COMPLETE / PASS + +Explicit merge authorization: +COMPLETE + +Controlled merge: +COMPLETE + +Post-merge main CI: +COMPLETE / SUCCESS + +Phase 0 completion record: +COMPLETE +``` + +--- + +## 6. Preserved Boundaries + +```text +AG-002 runtime wiring: +NO + +Provider execution: +DISABLED + +Production secrets in CI: +NO + +Database migration: +NO + +API route addition: +NO + +Deployment performed: +NO + +Coolify redeploy performed: +NO + +Branch protection enabled: +NO + +Auto-merge used: +NO + +Feature branch deleted: +NO +``` + +--- + +## 7. Remaining MVP Critical Path + +1. Redeploy the verified current `main` branch through the separately controlled + production deployment procedure. +2. Validate Dashboard compact provider cards, Project Open flow, and + backend-readiness-gated Deploy flow. +3. Reduce the GitHub App to the approved minimum permissions, reconnect the + controlled installation, and verify captured permission scopes. +4. Implement GitHub App installation-token repository acquisition. +5. Pin the analyzed repository commit SHA. +6. Acquire a bounded repository tree and create a normalized repository + snapshot. +7. Execute real repository analysis from that evidence. +8. Implement deep-analysis execution and Project reattachment. +9. Confirm `deploy_ready=true` from real evidence. +10. Execute one controlled Cloudflare Pages deployment. +11. Resolve only defects demonstrated by controlled live evidence. + +AG-001 and AG-002 runtime integration remain deferred until separately approved +architecture work. + +--- + +## 8. Branch Protection + +The stable check identity exists: + +```text +Backend CI / Validate +``` + +Branch-protection enforcement is not enabled and is not authorized by this +record. It requires a separate specification, approval, and controlled +repository-settings change. + +--- + +## 9. Deployment Decision + +```text +Deployment performed during Phase 0 completion: +NO + +Coolify redeploy required for documentation-only completion-record PR: +NO +``` + +The next production redeploy is a separate runtime operation and must not be +combined with this documentation-only record.